Before carrying out a work on the platforms of real estate or in lots, the intervention on the ground must be coordinated with Cusianagas to avoid damage to the gas pipelines.

Prevent network damage

If you are going to remodel the façade, change the floor of your platform, do gardening, burn or sprinkle in lots, install poles, build houses (footings or columns near the platforms), install other networks (water, energy , telephony), electrical or sewage inspection boxes or other activities that generate an excavation, keep in mind that gas networks pass under the construction of your house.

If you are going to carry out works that may interfere with the gas network, request our free support and information on the networks here