banner

Requirements for Certification and Commissioning

Household and commercial installations
  • Certificate of materials.
  • Technical report with a detailed description of the project of the fuel gas supply facilities and the respective plans signed by a registered professional with a valid professional card or by a competent person (Res 90902 of 2013).
  • Delivery of the individual line of the gas installation.
  • Approval by the distributor, in this case Cusianagas, accompanied by a concept on the availability of the provision of the public service of fuel gas at the construction site of the facility (Res 90902 of 2013).
  • Installer's Certificate of Labor Competence.
Industrial facilities according to Res.90902 of 2013.
  • Compliance with the technical requirements set forth in NTC 4282 "Installations for gas supply for industrial use".
  • Certificate of materials.
  • Technical report with a detailed description of the project of the fuel gas supply facilities and the respective plans signed by a registered professional with a valid professional card or by a competent person (Res 90902 of 2013). .
  • Delivery of the individual line of the gas installation.
  • Approval by the distributor, in this case Cusianagas, accompanied by a concept on the availability of the provision of the public service of fuel gas at the construction site of the facility (Res 90902 of 2013).
  • Installer's Certificate of Labor Competence.

Note: If you make any modifications to your facility that affect the size, total capacity or method of operation of the equipment, you must immediately request certification of the facility.

Request your certification visit for a new installation.

Safety tips